Robots Enter Fukushima Reactors, Detect High Radiation
The Associated Press is reporting that two PackBot ground robots from iRobot have entered Unit 1 and Unit 3 of the crippled Fukushima nuclear power plant and performed readings of temperature, oxygen levels, and radioactivity. The data from the robots, the first measurements inside the reactors in more than a month since a massive earthquake and tsunami damaged the plant, revealed high levels of radioactivity -- too high for humans to access the facilities. The remote-controlled robots entered the two reactors over the weekend. Details of the mission -- such as what areas of the reactors the robots inspected and from where they were operated -- are still scarce, but Tokyo Electric Power Co. (TEPCO), the plant's operator, said that the robots opened and closed "double doors and conducted surveys of the situation" inside the buildings.
ABB wins $120-million power transmission order in China
Jinping-Sunan UHVDC link to enable integration and transmission of renewable energy
Schilling Robotics sells three remote systems
Deep-ocean robotics manufacturer Schilling Robotics has sold three new remotely operated vehicle systems to contractor Subsea 7.
Records 11731 to 11733 of 11733
Industrial Robotics - Featured Product
ATI Industrial Automation - MC-50 Manual Tool Changer
With intuitive and ergonomic lever operation, the patent-pending MC-50 Manual Robot Tool Changer provides a simple solution for quickly changing robotic end-of-arm tooling by hand. This compact and robust Tool Changer is designed for applications on collaborative robots that support payloads up to 25 kg and small industrial robots supporting payloads up to 10 kg. Featuring an ISO 50 mm mounting interface on the Master-side and Tool-side, the low-profile MC-50 mounts directly to most cobots and seamlessly integrates with many common cobot marketplace grippers and end-effectors.